For a simple layout it's taken me a couple of evenings just to get the track dropper wires plumbed in.....
There are still the point motors to be connected, auto coupling solenoids to be installed, along with the baseboard to baseboard connectors. It's also about time I firmed up my thoughts as to how to build and where to site the control panel! The wiring will need a little bit of a tidy, I'd better leave this until my wiring is proven....... but I'm happy with the progress so far.